2 min read

HARRISON – Residents of Summit Hill Road are concerned about the safety of their stone walls.

Jeff Peterson told selectmen Tuesday that during the current ditching project on Summit Hill, “there have been some pretty severe cuts made pretty close to some stone walls. I don’t want to find my stone wall in the ditch.”

Because of residents’ concerns, selectmen asked road crews to stop work on the road early last week until residents, members of the road crew, and selectmen were able to discuss the problem together.

“I don’t think there’s anybody on this board who wants to get rid of stone walls,” Selectman Sheila Smith said at Monday’s meeting.

Members of the crew working on the ditching reassured homeowners that they would try to protect the walls. “If a rock falls down, I pick it up and put it back,” said Ray Fox, a member of the work crew.

Town Manager Michael Thorne explained that because the road is so narrow, the town cannot ditch it without coming close to the stone walls on the sides. “I can assure you,” he said, “they’re not going to take out any stone walls.” The finished ditches will be seeded with grass to help prevent any erosion.

“The key thing,” Thorne said, “is to get the water off the road.”

A man who, unlike other Summit Hill residents present, lives at the bottom of the hill, agreed with Thorne. “If that road isn’t ditched or cross-culverted, it doesn’t exist.” He said heavy rains in the past have caused water running down the hill to flood his basement.

Selectmen told residents that work on the hill would resume because of the need to keep water off the road.

Thorne is creating a prioritized list of roads for construction and said that Summit Hill “obviously will move up on the list because of the board’s intention to do the older roads first.”

Based on their condition, some roads on the list will be tarred, while others will be rebuilt.

Comments are no longer available on this story