BETHEL — SAD 44 directors on Monday approved an energy audit of the Telstar Middle/High School that the administration hopes will lead to substantial savings.
“This has been a concern for years,” Superintendent David Murphy said of wasted energy.
The board authorized spending up to $10,000 in federal stimulus money. The district’s architects, Smith Reuter Lull, will oversee the bid request and most likely work with energy auditors.
Tentative plans call for having the energy audit conducted in January. Before any vote by residents on whether to go with a major energy savings referendum, public hearings will be held.
Murphy is hoping an energy savings package could be put together by June. That’s when district residents would vote on whether to use capital improvement funds to make changes to the school building’s windows, walls, roof and any other area where heat escapes.
Murphy said that over the years, the district has set aside about $1.2 million for capital improvements. He is also hoping that some grant money may become available for energy-saving projects.
The complex was built in the late 1960s and is comprised of mostly brick and glass.
In other matters Monday, the board hired Telstar High School graduate Megan Kelly as a grade 5 teacher at Crescent Park Elementary School. She has been a longtime substitute teacher at the school, and is a graduate of the University of Maine.
Also, the district is working with the Maine Department of Transportation and the Oxford County Sheriff’s Office to improve safety along Route 26 for Telstar middle and high school students.
Murphy said a second flashing yellow light will be installed, and new, more easily seen 15 mph signs will be installed. The lower speed limit will be in effect during student arrival and departure times.
eadams@sunjournal.com
Comments are no longer available on this story