2 min read

CANTON – The site for a new dam on Whitney Brook contains lead and arsenic, according to an environmental assessment that was reviewed Monday night by a local advisory committee.

The assessment by MACTEC Engineering and Consulting of Portland revealed three contaminants of concern: Lead, arsenic and poly-aromatic hydrocarbons, a chemical compound that is a byproduct of fuel burning.

At several sites they were found in concentrations that create a risk for public use or construction. The contaminants are common in tanning plants and coal ash. The site is the location of the former Brindis Leather Co.

Brian Beneski, the Maine Department of Environmental Protection contact for the project, will attend the next committee meeting to review the assessment. Beneski had previously said that the level of contamination expected at the site was such that it could probably be capped and used for most purposes.

Committee Secretary Judy Hamilton quoted Beneski as saying that for most of its life the tannery used natural materials in tanning hides and had only used significant quantities of chemicals during its last years of production.

The committee will ask Beneski for his recommendations on cleaning up or encapsulating the contaminants so the site can be used for a dam to replace a dilapidated one downstream.

The dam regulates the water level in Anasagunticook Lake, which is located in Canton and Hartford.

 Civil engineer Kevin Cooley wrote to the committee that Kleinschmidt Consultants has started a preliminary dam design, concentrating on the flashboards and gate systems. A major concern expressed at a recent public hearing was the potential for the flashboards to break and then block flow under Route 108.

 The next meeting of the committee will be Aug. 9.

Comments are no longer available on this story