2 min read

The Maine Land Use Regulation Commission has made where it stands clear.

In rejecting Maine Mountain Power’s proposal for 30 wind turbines on Redington Pond Range and Black Nubble Mountain earlier this year, LURC stated the project’s potential environmental damage outweighed its merits.

It was a landmark decision, a stunning blow to alternative energy proponents. MMP now wishes to introduce a revised plan for 18 turbines on Black Nubble only, but has asked LURC to reopen its existing project record, which remains pending until the board’s final denial is filed.

Otherwise, MMP must restart the lengthy review process for a project with which LURC is intimately familiar. The board should grant MMP this courtesy, and allow it to introduce its new proposal backed by the record of the denied Redington/Black Nubble project.

Little has changed about the alternative energy debate since LURC’s rejection. Wind power remains integral for Maine, a point highlighted by the recent establishment of a governor’s task force on the topic, tasked to review wind farm regulations and designate Maine’s most suitable areas for them.

Opposition to Black Nubble, based on preserving attractive viewsheds, preventing ecological damage, and asking whether “is this the best place?” haven’t disappeared either. MMP hopes its scaled-back plan for Black Nubble will allay LURC’s concerns.

That the National Resources Council of Maine proposed the option of a Black Nubble-only development as a compromise during MMP’s initial review lends credence to this possibility.

Reopening the record for Redington/Black Nubble to accommodate a new, lesser proposal won’t change the fundamental debate surrounding wind power in Maine. It may not change LURC’s mind about the viability of Black Nubble as a site for wind power, as well.

But MMP should, at least, be given the chance to try, without starting from the beginning.

Comments are no longer available on this story