JAY – Owners of an idled power plant have requested a $26 million abatement for its machinery and equipment, which equals $404,484 in tax dollars to Jay for 2005-06.
Androscoggin Energy Limited Liability Co. claims the town overvalued its personal property at the natural-gas-fired power plant located at International Paper’s Androscoggin Mill site.
The company filed the abatement application with the town the week of Jan. 16 requesting the nearly $108.7 million assessed personal property valuation be dropped to $82.6 million.
The tax for the full personal property valuation is $1.68 million. In October, the company paid the first half of it: $842,392, said Jay Town Clerk Ronda Palmer on Thursday.
The company is not requesting an abatement for its valuation assessment of $8.8 million for real estate.
Those taxes equal $131,494 for the year and the company paid half of that, $65,747 in October, Palmer said.
The town still has a lien on the plant for the first half of the 2004-05 taxes, which are still owed. The sum was $1 million in the spring of 2005. Androscoggin Energy filed for bankruptcy protection in November 2004.
The plant has been shut down since then, and the company is in the process of liquidating.
Androscoggin Energy asked for the abatement claiming the town’s industrial assessors used the wrong method to assess the natural-gas-fired power plant. The company alleges ValPoint only relied on the historical-cost less-depreciation method and didn’t consider a replacement-cost approach.
Androscoggin Energy claims there is data available in the market to support significant obsolescence due to a lack of demand for power-generating facilities, declining equipment cost and the bankruptcy of Androscoggin Energy Center. That data was available through published articles, the company claims.
Since January 2001, Androscoggin Energy claims that the project, as well as the entire independent power producers industry, has suffered from extreme economic obsolescence resulting from the failure of: electricity deregulation, creation of an over-capacity marketplace, drop in demand rates for electricity and drastic decrease in natural gas prices. It also says the bankruptcy of Androscoggin Energy Center and contractual differences with IP and the loosened requirements of the Clean Air Act, which has allowed older “dirty” and less efficient plants to continue to operate, have contributed to the problem.
Androscoggin Energy and IP are trying to work out an agreement in a dispute over a breach-of-contract lawsuit.
A federal jury awarded IP $41 million in damages in November 2004 for an alleged breach-of-service agreement over steam supply to the paper mill. Androscoggin Energy, which is jointly owned by Wisvest Corp. (66.7 percent), Calpine Corp. (32.3 percent) and IP (1 percent) has appealed the award.
Calpine Corp. filed for bankruptcy protection on Dec. 20.
Comments are no longer available on this story