You have a registered email address and password on pressherald.com, but we are unable to locate a paid subscription attached to these credentials. Please verify your current subsription or subscribe.
Anyone can access the link you share with no account required. Learn more.
Article link sent!
An error has occurred. Please try again.
With a Lewiston Sun Journal subscription, you can gift 5 articles each month.
It looks like you do not have an active subscription connected to this login. You can subscribe below, or to connect your existing subscription, go to myAccount.
A Pike Industries paving crew waits Friday afternoon in Rumford as Route 2 traffic passes. The company was awarded the $2.8 million Maine Department of Transportation project, along with another section of Route 2, and Veterans Street between Routes 2 and 108 on NewPage paper mill property.
A Pike Industries crewman drives a road roller over newly-laid pavement on the eastbound side of Route 2 in Rumford on Friday afternoon.
Comments are no longer available on this story