LIVERMORE FALLS — The Select Board on Aug. 5 approved using $15,818.41 from the town’s capital improvement reserve account to match a Federal Emergency Management Agency grant for engineering work on the Norris Bridge off Strickland Road.
Town Manager Carrie Castonguay said the bridge has “significant structural deficiencies” and FEMA, through coordination with the Maine Emergency Management Agency, awarded the town $47,458.21 to cover 75% of the $63,277.62 for design and engineering. The work includes a hydrology study, preliminary and final designs and construction permitting, and make the town eligible for additional construction funding.
The board voted 4-1 to approve the match.
Castonguay noted the bridge must be at least 20 feet long for the Maine Department of Transportation to assume responsibility. The current span is about 14 feet.
Delaying the project, she said, risks the bridge’s collapse and could result in the road being dead-ended on both sides, eliminating the traffic loop in that area.
Comments are not available on this story. Read more about why we allow commenting on some stories and not on others.
We believe it's important to offer commenting on certain stories as a benefit to our readers. At its best, our comments sections can be a productive platform for readers to engage with our journalism, offer thoughts on coverage and issues, and drive conversation in a respectful, solutions-based way. It's a form of open discourse that can be useful to our community, public officials, journalists and others.
We do not enable comments on everything — exceptions include most crime stories, and coverage involving personal tragedy or sensitive issues that invite personal attacks instead of thoughtful discussion.
You can read more here about our commenting policy and terms of use. More information is also found on our FAQs.
Show less