3 min read

FARMINGTON — After months of planning, renovations in the Emergency Department at Franklin Memorial Hospital are expected to begin around September, Executive Vice President Gerald Cayer said on Friday.

During the summer, hospital officials will continue a planning process that questions whether the hospital is using space effectively and how to reconfigure to provide the best outpatient services, he said. He foresees a one- to three-year process of planning and renovating.

Plans for the Emergency Department focus on thoughtful management of the flow of people to better support patient-centered care, he said.

The space wasn’t designed for the volume of people coming through the department, leading to privacy issues and the ability to provide that patient care, he said.

“Satisfaction scores are great for our clinical care,” he said.

Now they want to continue working on patient satisfaction.

Advertisement

A busy department, it can sometimes feel chaotic when filled with patients. Emergency department nurses and doctors voiced a need for changes.

In an effort to gain perception on what it’s like, hospital administrators spent two-hour stints behind the emergency department desk and another sitting in the waiting room, he said. They also visited several other hospital emergency rooms and found none had the open access that FMH’s ER has.

Cayer’s impression from behind the desk centered on the number of people who enter the hospital from the emergency room door because they are not familiar with the hospital and the number of times an automatic door from the hall into the patient area opens, he said. Both interrupt the work being done behind the desk.

Privacy for medical personnel while dealing with patients and families and following doctor orders will be addressed with the addition of a glass wall above the desk.

Room for crisis team members to work is also in the plan.

The ER is the gateway for people in crises, he said. Most cases are managed there, but some need to be transferred to other facilities. Team members need to make those arrangements.

Advertisement

The renovation work begins with moving patient registration to the area where the telephone receptionist is now located. The receptionist will move closer to the gift shop, and the entrance to the gift shop will be moved.

A hallway to the ambulance entrance will allow people to enter the hospital after-hours for the surgical or obstetric units without going through the emergency room or waiting area, he said.

Some walls will be moved to allow for a registration person in the present ER waiting room and a door to manage the entrance of visitors into the emergency room, he said. The goal is to provide bedside registrations in the emergency room.

A small seating area for triage and a greeter will help direct patients and visitors, Cayer said.

The plans also include a seating area and changing room for patients going to the mobile magnetic resonance imaging unit. A covered walkway will lead directly to the outside unit, he said.

It’s not a huge project but can make a big impact on how people access the space, he said.

Advertisement

A couple months of construction are anticipated.

The project will be covered by donations and a budgeted amount, he said. The expected cost is still being tallied, but $378,000 in donations have already been received, he said.

abryant@sunjournal.com

Comments are no longer available on this story