You have a registered email address and password on pressherald.com, but we are unable to locate a paid subscription attached to these credentials. Please verify your current subsription or subscribe.
Public works crews remove benches and planters from park ahead of construction.
Posted
Updated
1 min read
Font size +
You are able to gift 5 more articles this month.
Anyone can access the link you share with no account required. Learn more.
Article link sent!
An error has occurred. Please try again.
With a Lewiston Sun Journal subscription, you can gift 5 articles each month.
It looks like you do not have an active subscription connected to this login. You can subscribe below, or to connect your existing subscription, go to myAccount.
Colby Gagne of Lewiston Public Works grinds off a bolt anchoring a metal bench to a concrete paver Wednesday morning at Dufresne Plaza in Lewiston. A major reconstruction project is underway for the small park between Lisbon and Park streets. The project is expected to be completed by the end of June. Russ Dillingham/Sun Journal
Comments are no longer available on this story