You have a registered email address and password on pressherald.com, but we are unable to locate a paid subscription attached to these credentials. Please verify your current subsription or subscribe.
Photo/Video: January flyover of Edward Little High School construction project
An aerial view of the athletic fields and new high school under construction in Auburn.
Posted
1 min read
Font size +
You are able to gift 5 more articles this month.
Anyone can access the link you share with no account required. Learn more.
Article link sent!
An error has occurred. Please try again.
With a Lewiston Sun Journal subscription, you can gift 5 articles each month.
It looks like you do not have an active subscription connected to this login. You can subscribe below, or to connect your existing subscription, go to myAccount.
Construction of the new Edward Little High School, upper right, continues Tuesday at 77 Harris St. in Auburn. The $104.7 million project began in March 2022 and will open next fall. The old school, center, will eventually be demolished and a new multisport complex will be built in the area in the foreground. Visit sunjournal.com to watch a video flyover. Russ Dillingham/Sun Journal
Construction of the new Edward Little High School, upper right, continues Tuesday at 77 Harris St. in Auburn. The $104.7 million project began in March 2022 and will open next fall. The old school, center, will eventually be demolished and a new multisport complex will be built in the area in the foreground. Visit sunjournal.com to watch a video flyover. Russ Dillingham/Sun Journal
Construction of the new Edward Little High School, upper right, continues Tuesday at 77 Harris St. in Auburn. The $104.7 million project began in March 2022 and will open next fall. The old school, center, will eventually be demolished and a new multisport complex will be built in the area in the foreground. Visit sunjournal.com to watch a video flyover. Russ Dillingham/Sun Journal
Comments are no longer available on this story