You have a registered email address and password on pressherald.com, but we are unable to locate a paid subscription attached to these credentials. Please verify your current subsription or subscribe.
Anyone can access the link you share with no account required. Learn more.
Article link sent!
An error has occurred. Please try again.
With a Lewiston Sun Journal subscription, you can gift 5 articles each month.
It looks like you do not have an active subscription connected to this login. You can subscribe below, or to connect your existing subscription, go to myAccount.
The fan-shaped framework for the 1,200-seat auditorium, center background, is shown Wednesday at Edward Little High School on Harris Street in Auburn. The $104.7 million project began in March 2020 and is expected to finish by the start of the 2023-24 school year. The old school will eventually be demolished and new athletic fields built. Russ Dillingham/Sun Journal
The fan-shaped framework for the 1,200-seat auditorium is shown Wednesday at Edward Little High School on Harris Street in Auburn. The $104.7 million project began in March 2020 and is expected to finish by the start of the 2023-24 school year. The old school will eventually be demolished and new athletic fields built. Russ Dillingham/Sun Journal
The fan-shaped framework for the 1,200-seat auditorium is shown Wednesday at Edward Little High School on Harris Street in Auburn. The $104.7 million project began in March 2020 and is expected to finish by the start of the 2023-24 school year. The old school will eventually be demolished and new athletic fields built. Russ Dillingham/Sun Journal
Comments are no longer available on this story