TURNER — The Turner Center Bridge over the Androscoggin River opened for traffic today following a ribbon-cutting ceremony.

The $7.5 million structure is 34 feet wide, compared to the previous 20-foot-wide bridge. Town Manager Kurt Schaub said school buses and emergency vehicles will have a much easier time using the bridge now; the old bridge was too narrow to allow two buses to pass.

The bridge, which connects Turner to Greene, took more than two years to complete.

Comments are no longer available on this story