You have a registered email address and password on pressherald.com, but we are unable to locate a paid subscription attached to these credentials. Please verify your current subsription or subscribe.
Anyone can access the link you share with no account required. Learn more.
Article link sent!
An error has occurred. Please try again.
With a Lewiston Sun Journal subscription, you can gift 5 articles each month.
It looks like you do not have an active subscription connected to this login. You can subscribe below, or to connect your existing subscription, go to myAccount.
Farmington Public Works crew members Ted Collins, left, and Jim Kiernan, right, fill potholes along Route 2 (Wilton Road) in Farmington on Tuesday morning. A second crew was working on the other side of the road from Bouffards towards town, Kiernan said. The rough road and potholes, although unwelcome, reassure that spring is on the way after these difficult winter months.
Farmington Public Works crew members fill potholes along Route 2 (Wilton Road) in Farmington on Tuesday morning. A second crew was working on the other side of the road from Bouffards towards town, Jim Kiernan said. The rough road and potholes, although unwelcome, are a reminder that spring will come after these difficult winter months.
Farmington Public Works crew members Ted Collins, left, and Jim Kiernan, right, fill potholes along Route 2 (Wilton Road) in Farmington on Tuesday morning. A second crew was working on the other side of the road from Bouffards towards town, Kiernan said.
Comments are no longer available on this story