You have a registered email address and password on pressherald.com, but we are unable to locate a paid subscription attached to these credentials. Please verify your current subsription or subscribe.
Anyone can access the link you share with no account required. Learn more.
Article link sent!
An error has occurred. Please try again.
With a Lewiston Sun Journal subscription, you can gift 5 articles each month.
It looks like you do not have an active subscription connected to this login. You can subscribe below, or to connect your existing subscription, go to myAccount.
The New Vineyard Public Library expansion is moving along. Footings were poured in early December and by Tuesday the walls were up, the roof was on and windows were in. March 1 is the the target completion date. When the expansion is finished, the library space will more than double. The library, Historical Society and Town Office are in the building at right. The Town Office will move to the existing library in the front of the building and the Historical Society will move into the Town Office space.
Comments are no longer available on this story